F or example, if the renewal date is 0 and the trial of the App is started on 2, the trial period end date will be consistent with the next renewal date - in this case being the 0.
0 Comments
Leave a Reply. |
F or example, if the renewal date is 0 and the trial of the App is started on 2, the trial period end date will be consistent with the next renewal date - in this case being the 0.
0 Comments
Leave a Reply. |